Percent load - Ratio between the power Pu drawn by the load and the rated output Pn of a UPS system (Pu/Pn). Sometimes referred to as the load factor.
Switching Transients - Rapid voltage peak up to 20,000 volts with a duration of 10mS to 100mS.
Earthing system TN - Earthing system in which the exposed conductive parts are interconnected and connected to the neutral. The neutral is connected to the earth. The installation must be de-energized immediately in the event of an insulation fault.
Power Surge - Voltage above 110% of rated RMS voltage for one or more cycles.
Electromagnetic compatibility - Possibility of a device to operate normally when installed near other devices, given the disturbances emitted by each device and their mutual sensitivities.
Cubicle (parallel UPS unit) - Cubicle containing a rectifier/charger and an inverter. It is connected to one or several other identical cubicles and a bypass cubicle to make up a parallel UPS.
Discharge - The conversion of the chemical energy of a battery into electrical energy, and the withdrawal of the electrical energy into a load.